SKU-level inventory, reorder, and will-call control
Activity statusCurrent workspace signals stay available without crowding the first screen.Open signalsHide signals
Guided branch walkthrough
Follow one order from receiving to invoice
Counter fulfillment lane
Quote, payment, pick ticket, release, invoice
Apex Remodel
Sonoma guest bath rough-in
Total
$358.81
Deposit
$0.00
Pickup
Not staged
Confirm the quote, capture payment, and stage a pick ticket before the contractor arrives.
Counter lane actions5 actions
Riverbend main counter
Branch morning ops board
Start the day from the branch queues that actually block customer handoff.
Today lanes
5/5
2 critical holds
Branch control queue
Filter the morning board by action state, then route the manager into the exact workspace that owns the next branch handoff.
Critical
2
Active
5
Cleared
0
Open branch control rows5 lanes
View lane details5 lanes
Open branch handoff checksManager queue
Manager queue
Next branch move
Clear scanner review for Warehouse bin label.
Branch operating setup
Rollout control pulse
Readiness
Draft
Supplier credit recovery
0% reconciled
Launch rule
Manual ERP export until branch manager sign-off
Branch action drawerResolve the next operational blocker without leaving the ops boardNext: Warehouse bin label. Bin label check flagged a shortened SKU suffix for buyer review.3 actions waitingOpen queueHide queue
Counter handoff
Quote reviewApex Remodel checkout
Confirm the quote, capture payment, and stage a pick ticket before the contractor arrives.
0/6 checkout steps done; INV-Q-9101 stays tied to the handoff.
Receiving and scanner
ReviewWarehouse bin label
Bin label check flagged a shortened SKU suffix for buyer review.
VLV-BALL-034-BR resolves to Aisle 03 / Bin B12; 1/3 scanner checks passed.
Stock pressure
ReviewSioux Chief reorder
Below reorder point and tied to two active repair-part quotes. Suggested quantity: 48.
$688 estimated PO; target ETA This week.
ERP packet
HoldReceiving exception packet
Receipt quantities and dock exceptions must be accepted before inventory writeback.
0/8 batches approved; run #0. ERP export preflight staged for PipeStock Pro.